New Transcritical CO₂ booster packages now quoted in two working days. Learn more →
Sample · not for construction

What lands in your shared folder.

Extracts from an invented sample project: Northgate Market, 14 consumers, CO₂ transcritical booster, R744. Every name and number is illustrative.

01 · PDF · Small 4 to 6 pages · Medium 14 to 22 pagesSample · not for construction

Calculation report

Inputs and assumptions first, so you can check what the result is based on. Then COOLSTAR output per circuit, conclusions and limits. Every page carries the document number and revision.

On the cover
Calculations only, not a stamped design. The client stays designer of record.
  1. 1Scope and limits
  2. 2Design conditions and input data
  3. 3Load summary
  4. 4Suction line sizing, LT and MT
  5. 5Liquid, discharge and gas cooler lines
  6. 6Pressure drop and velocity checks
  7. 7Conclusions
  8. 8Appendix: COOLSTAR output
KOLLESSOCalculation report · KLS-2026-0147 · Rev B
2. Design conditions

Values supplied by the client in the equipment list dated 04.02.2026. No site survey performed.

SystemR744 transcritical booster
Ambient design32 °C
Evaporating, LT−32 °C
Evaporating, MT−8 °C
Gas cooler outlet35 °C
Pipe materialK65, EN 12735
Max suction velocity10 m/s
3. Load summary
LT load
16.0 kW
MT load
48.4 kW
Gas cooler
86.0 kW
Kollesso Group OOD · Varna, BulgariaPage 3 of 18
02 · XLSX · formulas left liveSample · not for construction

Pipe sizing table

CircuitServiceLength LoadPipe sizeRiser ΔpVelocityStatus
LT-01Freezer cabinets A18.4 m6.2 kW15 × 1.0Y0.8 K7.4 m/sOK
LT-02Freezer cabinets B24.1 m9.8 kW18 × 1.0Y1.1 K8.1 m/sOK
LT-03Freezer cold room9.8 m4.4 kW15 × 1.0N0.5 K6.2 m/sOK
MT-01Chilled multideck 131.7 m22.4 kW28 × 1.5N0.9 K6.8 m/sOK
MT-02Chilled multideck 227.3 m18.9 kW22 × 1.5Y1.3 K9.2 m/sWatch
MT-03Prep room coolers12.6 m7.1 kW15 × 1.0N0.6 K5.9 m/sOK
MT-04Meat cold room19.4 m11.3 kW18 × 1.0N1.0 K7.7 m/sOK
LIQ-01Liquid line, MT34.5 m48.4 kW22 × 1.5N0.3 K1.1 m/sOK
DIS-01Discharge to gas cooler41.2 m86.0 kW35 × 2.0Y0.4 K4.3 m/sOK
FG-01Flash gas bypass8.7 m12.0 kW15 × 1.0Y1.4 K9.6 m/sWatch
How the status is set
OKWithin all limits.
WatchAt or above 85% of a maximum (velocity or pressure drop), or a riser within 10% of the minimum velocity.
Limits are set per project on the Criteria tab.
Pipe length per size
15 × 1.049.5 m
18 × 1.043.5 m
22 × 1.561.8 m
28 × 1.531.7 m
35 × 2.041.2 m
Included free. The full bill of materials is the paid material take-off.
03 · PDF · one page for siteSample · not for construction

Installer notes

WATCH
MT-02 suction velocity
What we found9.2 m/s at full load, 92% of the 10 m/s limit.
What to do on siteKeep the route as drawn. If it grows by more than 3 m, email us before brazing.
WATCH
Flash gas line bends
What we foundShort line with a tight pressure drop margin.
What to do on siteNo extra bends beyond the two shown. Keep the riser vertical.
NOTE
Oil return on LT risers
What we foundTwo risers on LT-01 and LT-02.
What to do on siteFit oil traps at the bottom of each riser as marked. Do not reduce the pipe above them.
NOTE
Insulation
What we foundAll suction lines run below the dew point.
What to do on site19 mm minimum insulation on suction lines, vapour sealed at every support.
Questions on site? Send us a message with the document number. We reply within 24 hours on working days.
Want this for your job?
Fixed quote within two working days.
Request a quote